If I sounded cranky and tired in my post yesterday it was caused by the heat - not by the idea of setting quilting goals. Today was quite a bit cooler, with a high of 84. Tomorrow we are supposed to be back to the high 70's, with no rain in sight. Perfect weather in my humble opinion. Those of us who live west of the mountains in the great Pacific Northwest are just not used to high temperatures, especially as they almost always come with high humidity.
I have never had any trouble setting quilting goals. I usually always know what I want to work on for the month. If I change my mind mid-month, that's OK. I never allow myself to be a slave to the goals I've set. However, the beginning of this month was different. I looked at what I've been doing in previous months, what is out in my sewing room currently being worked on, and the many things I could start. I loved every single thing I was looking at, and just didn't feel like making any decisions. (I can never made decisions when I'm too hot.)
I didn't know what my goal was going to be when I started my post, I just typed "on faith", figuring I'd come up with something. And I did - a perfect goal for this lazy summer month that is likely to be hotter than normal. The goal appeared as I typed, and I love it. So we will all be in suspense over what quilty things I'll be doing - me included!
(And now you know the rest of the story . . . .)
Today I prepped two more small applique quilts and have just started a third. I've decided I need to prepare a great deal of applique to hold in reserve for days when it is too hot to turn on the iron. I can alternate between hand quilting and hand applique, as I use different muscles for each process. This will be much better for my hands. These two are also small quilts from the time I subscribed to Jan Patek's small quilt club. Once prepped this simple applique goes very quickly, and big stitch quilting is very appropriate for finishing them. Some of them need to have the quilt top sewn together before doing any applique, so I'll spend Friday this week doing that.
My goal at the moment is to have many "applique kits" ready for me to start at a moment's notice. A perfect result that fits right into my July goal LOL!
Wednesday, July 3, 2013
Tuesday, July 2, 2013
Goals
I accomplished a lot quilt-wise in June. I am very happy with all I got done. Nevertheless, I didn't accomplish 5 of my 9 goals, and only half accomplished another. Obviously I grossly overestimated what I could get done this month.
When I think about setting July goals I just feel tired. For once I have no idea what I want to work on. I think it is probably the heat making me feel like this, as it really isn't like me at all. Today is to be another hot one, and then temperatures are supposed to start dropping back to normal. I'm looking forward to that. So I'm setting one broad goal for the month and calling it good.
"By the end of July I will see progress made on many new and ongoing fiber projects."
How's that for vague? Just what I feel I need this month. I know I will be sewing, quilting, knitting and possibly spinning. I just don't know what yet. And that is good enough for me.
When I think about setting July goals I just feel tired. For once I have no idea what I want to work on. I think it is probably the heat making me feel like this, as it really isn't like me at all. Today is to be another hot one, and then temperatures are supposed to start dropping back to normal. I'm looking forward to that. So I'm setting one broad goal for the month and calling it good.
"By the end of July I will see progress made on many new and ongoing fiber projects."
How's that for vague? Just what I feel I need this month. I know I will be sewing, quilting, knitting and possibly spinning. I just don't know what yet. And that is good enough for me.
Monday, July 1, 2013
Tour de Fibre - Day 3
Another hot, muggy day. I finished quilting the center and one short border of the Jo Morton four-patch. By then my hands were hurting, telling me it was time to stop quilting and give them a rest. I marked the other short border, then set it aside for later, not wanting to do the math required to fit the stencil to the long sides.
I spent some time catching up on blog reading the rest of the morning, but I still have a LONG way to go to get caught up.
I brought the plastic bag containing many small Jan Patek quilt kits down from upstairs, and started tracing applique pieces. When I finished each packet I cut out the freezer paper templates then turned on the iron just long enough to press the templates to their respective fabrics. When finished I turned off the iron and cut out each piece. The pieces were carefully folded inside the pattern pages, the fabric scraps behind, and everything tucked back into the kit envelope. I completed two, and have the paper templates for a third kit ready to iron onto the fabrics tomorrow.
Here are pictures of the two that are ready to go, and the third that is almost ready. The first picture doesn't show the entire quilt, just the center.
I realize it is now July, and I've not yet done a "goals" post. I'll do that tomorrow.
I spent some time catching up on blog reading the rest of the morning, but I still have a LONG way to go to get caught up.
I brought the plastic bag containing many small Jan Patek quilt kits down from upstairs, and started tracing applique pieces. When I finished each packet I cut out the freezer paper templates then turned on the iron just long enough to press the templates to their respective fabrics. When finished I turned off the iron and cut out each piece. The pieces were carefully folded inside the pattern pages, the fabric scraps behind, and everything tucked back into the kit envelope. I completed two, and have the paper templates for a third kit ready to iron onto the fabrics tomorrow.
Here are pictures of the two that are ready to go, and the third that is almost ready. The first picture doesn't show the entire quilt, just the center.
I realize it is now July, and I've not yet done a "goals" post. I'll do that tomorrow.
Labels:
Hand Quilting,
Jan Patek Quilts
Sunday, June 30, 2013
Tour de France . . . Fibre . . . Fleece . . . .
How many of you watch the Tour de France? It was four or five years ago that I first started watching so I could see the beautiful countryside as the riders "toured". Much to my surprise I also got wrapped up in the race too, and have been watching it ever since. If you watch, who is your favorite rider?
Then there is the Tour de Fleece. Hosted on Ravelry, a fabulous website for knitters, crocheters and spinners, the Tour de Fleece provides many challenges for hand spinners, who make yarn while watching the race. Last year I participated on 12 different Tour de Fleece teams and spun over 8 pounds of fiber while watching. It was great fun!
Then there is the "Tour de Fibre", hosted by Hanne and May. Their only requirement is a daily blog post, but the idea is to work on quilting projects while watching the tour. Easy enough to do!
Yesterday's race was unusual to say the least, with a team bus getting stuck under the finish line banner 15 minutes before the race end, and a huge collision about 2 km before the finish line which took out the sprint favorites. The first three days this year are on the island of Corsica - what an incredibly beautiful place!
I did a bit of cleaning and straightening in the sewing room while watching, but spent most of the day hand quilting a Jo's Little Women top I made earlier this year. I can easily finish the center today, and hopefully by that time the border will have told me how it wants to be quilted. I know I've said it before, but I just can't get over how very much I'm enjoying all this hand quilting. And, thankfully, my hands are holding up well with no pain, even after several hours. I should be able to finish most if not all the quilting today.
Thankfully, yesterday wasn't as muggy as the day before and the sewing room was relatively cool compared to much of the house. Gave me a great excuse to spend the day there. The forcast for the next few days has changed from the high 90's to the low 90's, also better.
The recording of today's race has finished, so I think it's time to get back to quilting!
Labels:
Spinning,
tour de France,
UFO's
Saturday, June 29, 2013
The best laid plans . . .
aren't going to happen - at least for now. We are having a heat wave here in the Pacific Northwest, which is almost unheard of in June. It comes with a humidity index far above normal. Yesterday was 89 degrees, but with the humidity it felt at least 10 degrees higher. By Monday and Tuesday we are predicted to hit 99 or even higher. And we have no air conditioning.
All this means that work in the sewing room is almost at a standstill. The last thing I want to do is turn on the iron. It is amazing how quickly an iron can send the temperature in the room skyrocketing. So much for the applique prep I planned to do. So much for making binding. At 10:30 last night it finally cooled off enough for me to tolerate fabric on my lap, so I started quilting another quilt. Thursday night I finished quilting the fourth quilt this month, but binding will just have to wait, as it is 95 degrees upstairs in the room where my Pfaff and its walking foot live.
So, while I wait for the temperatures to revert to normal, I'll just post some pictures. The first is the quilt I just finished quilting. Instead of an all-over grid, I did a background grid with applique details quilted. The curving quilting on the flag gives the illusion of movement. I'm amazed how quickly I finished this. The border quilting isn't white - I've not yet sponged off the chalk.
Visiting the three quilt shops in Bend, Oregon was a highlight of our camping trip last week. I started my stash of batiks in anticipation of combining them with reproductions for the "Edyta Sitar" look.
All this means that work in the sewing room is almost at a standstill. The last thing I want to do is turn on the iron. It is amazing how quickly an iron can send the temperature in the room skyrocketing. So much for the applique prep I planned to do. So much for making binding. At 10:30 last night it finally cooled off enough for me to tolerate fabric on my lap, so I started quilting another quilt. Thursday night I finished quilting the fourth quilt this month, but binding will just have to wait, as it is 95 degrees upstairs in the room where my Pfaff and its walking foot live.
So, while I wait for the temperatures to revert to normal, I'll just post some pictures. The first is the quilt I just finished quilting. Instead of an all-over grid, I did a background grid with applique details quilted. The curving quilting on the flag gives the illusion of movement. I'm amazed how quickly I finished this. The border quilting isn't white - I've not yet sponged off the chalk.
Visiting the three quilt shops in Bend, Oregon was a highlight of our camping trip last week. I started my stash of batiks in anticipation of combining them with reproductions for the "Edyta Sitar" look.
I also purchased a nice selection of beautiful hand dyed Prescentia "Finca" threads, something I've wanted for some time. I'm using them to hand quilt the small quilt started last night.
On Thursday I kept my friend Kim company on a trip north to "Momma Made It" - our favorite quilt shop in Longview Washington. Of course I took advantage of the opportunity to fill a couple holes in my stash, and add to my growing batik collection. Sharon, the owner, has added batiks to the reproduction fabrics that are the backbone of her shop offerings. I can tell right now - it is going to be hard to keep track of what batiks I've already purchased so I don't duplicate any on future quilt shop trips.
I see a blue quilt in my future with either sashings or alternate setting squares of cheddar - I'm just not sure what quilt block I want to base it on.
Tuesday, June 25, 2013
Oh my goodness!
How the blog posts pile up when one is gone! I have 482 posts to get through, so I probably won't be leaving many comments until I've caught up. I can hardly wait to see what everyone has been doing while I've been gone!
Monday, June 24, 2013
We are home again
On Wednesday morning we hitched the tent trailer to the Highlander and took off for a 5-day camping trip. This time we went to La Pine State Park - 27 miles south of Bend, Oregon, in the high desert. This was our "anniversary trip" to celebrate 44 years of marriage. When I made the reservations the extended weather forecast called for temperatures in the 70's, with the weather getting warmer each day. Instead the temps were in the 60's with a cold wind blowing, and rain at night. Finally on Saturday the skies cleared and the warm weather arrived, followed Saturday night and Sunday by rain. We aren't having the best of luck weather-wise this year!
Nevertheless we had a great time. We went into Bend on Friday for an anniversary dinner at Balthazar's Mexican Seafood Restaurant (no website). We had one of the most fabulous eating out experiences we've had in a long time! We went into town early enough that I was able to visit all three Bend quilt shops - fun!
I focused on big stitch quilting while there, and was able to finish another quilt top and start quilting a fourth. It feels so good to be getting so much accomplished! Once I finish quilting the fourth quilt - the one I'm doing now - I'll get them all bound. I should be able to do that by the end of the month even if I don't accomplish anything else.
| Angel Dance, designed by Jan Patek |
Monday, June 17, 2013
Quilting progress
Before I started playing with EQ7, I was cutting 30's prints for more baskets. We tend to think of quilting as a sedentary activity, but when one is rotary cutting, piecing, and pressing, there is much getting up and down, prolonged standing, and walking back and forth between the machine and the pressing station. My machine and pressing station are about 7 feet apart, and often the only exercise I get is walking back and forth during a marathon piecing session.
Wednesday afternoon I received cortisone shots in both knees for arthritis, which means I was to stay off my feet as much as possible for three days. Once the three days are past I'm still supposed to eliminate any unnecessary walking and/or prolonged standing for 3-4 weeks. In my mind that means I can't spend much time piecing or rotary cutting if I want the shots to have the best effect.
So, since Wednesday afternoon I've been hand quilting. I've finished two tops, and am ready to start a third. Here are pictures of what I've done.
For once the quilting shows up quite well in the pictures, especially when enlarged. I'll wait a bit before binding them, as that will involve two or three trips up and down the stairs plus what at this time I'd call unnecessary walking and standing. After all, I have quite a few more tops basted and ready for quilting. That's what I'll be doing the next few days at least.
Wednesday afternoon I received cortisone shots in both knees for arthritis, which means I was to stay off my feet as much as possible for three days. Once the three days are past I'm still supposed to eliminate any unnecessary walking and/or prolonged standing for 3-4 weeks. In my mind that means I can't spend much time piecing or rotary cutting if I want the shots to have the best effect.
So, since Wednesday afternoon I've been hand quilting. I've finished two tops, and am ready to start a third. Here are pictures of what I've done.
For once the quilting shows up quite well in the pictures, especially when enlarged. I'll wait a bit before binding them, as that will involve two or three trips up and down the stairs plus what at this time I'd call unnecessary walking and standing. After all, I have quite a few more tops basted and ready for quilting. That's what I'll be doing the next few days at least.
Whoops! We are more than half way through the month and I've yet to write my report for "The Year of the Finished Project". About time, don't you think?
I've done well this month so far - I've crossed 4 of 9 goals off my list. Here are the rest of the things I expect to finish by June 30th.
1. Finish knitting the Monkey Socks - one sock is halfway done
2. Quilt, bind and label four small quilt tops - the quilting is finished on one and almost finished on a second.
3. Finish 24, 30's basket blocks - partly rotary cut
4. Complete first month's installment of Flower Basket - I should have time to do this.
Stretch goals? Yes. Can I get them done? I should be able to - only time will tell.
Do you EQ?
I wanted Electric Quilt for years before I finally bought it. Our computers were always Apple products, and an Apple version has never been written. Finally, after our kids graduated from college, we switched to a PC and I got my wish. That was EQ4 in the mid- to late-1990's. Since then I've bought each upgrade. However, I never managed to stop sewing long enough to learn how to use it.
When I started keeping this blog and making yearly quilting goals I decided to make mastering this software one of my goals for the year. By then EQ6 was the latest version. I followed through and started working with the program. It was an invaluable resource when I started Civil War Diary and Civil War Love Letters, as it allowed me to print foundation papers for the blocks in the books. However, I didn't use it to design quilts I actually made.
And then I started to knit. And hand spin. And quilting faded into the background of my life for almost three years. I stopped using the software and forgot most of what I'd learned.
Now that I'm back to quilting, I decided to upgrade to the newest version. It arrived in the mail about 10 days ago. I sat down at the computer, loaded the software and started playing. I discovered many lessons to help one learn, and many demonstration videos were included. I immersed myself in learning. And I'm still learning. I've been having a great time, with only one problem. Doing this gave me nothing to blog about. Which is why I've been MIA.
And now you know the rest of the story.
I would love your comments telling me how you like to use this software. Do you just play for inspiration, or do you design quilts that are eventually made? If you design a quilt, do you plan it down to the last detail by "coloring" it with the fabrics you will use? Do you scan your own fabrics to use in the software? What else do you do with it? Curious minds want to know.
Subscribe to:
Posts (Atom)







